MIL-PRF-15733/59B
TABLE III. Group A inspection. 1/
Test or inspection
Sampling procedure
Thermal shock
100%
Voltage conditioning
100%
Dielectric withstanding voltage
100%
Insulation resistance
100%
Voltage drop
100%
Insertion loss
100%
Seal
100%
Visual and mechanical inspection
See MIL-PRF-15733.
Group A inspection.
*
1/ This table replaces table IV (Group A inspection) of MIL-PRF-15733.
TABLE IV. Group C inspection. 1/
Examination or test
Number of
Number of
samples
defectives
to be inspected
allowed
Subgroup 6
Transient voltages
4
0
Inrush transients
4
*
1/ This table is an addition to table VI (Group C inspection) of MIL-PRF-15733.
Part or Identifying number (PIN): M15733/59- (dash number from table I).
*
Supersession data for new design: See Table V
*
TABLE V. Supersession data
For new design use
Inactive PIN
Specification sheet
PIN
M15733/59-0001
M28861/05-005TB
M15733/59-0002
M28861/05-004TB
M15733/59-0003
M28861/05-008TB
M15733/59-0004
M28861/05-007TB
M15733/59-0005
M28861/05-011TB
M15733/59-0006
M28861/05-010TB
NOTES:
Referenced documents. In addition to MIL-PRF-15733, this specification sheet references the following
*
documents.
*
Changes from previous issue: The margins of this specification sheet are marked with asterisks to indicate where
changes from the previous issue were made. This was done as a convenience only and the Government assumes
no liability whatsoever for any inaccuracies in these notations. Bidders and contractors are cautioned to evaluate
the requirements of this document based on the entire content irrespective of the marginal notations and
relationship to the last previous issue.
8
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business